Find A Local Expert Ready To Help 24/7!
Ron Jones is a veteran, GM of Restoration 1 and a deWald-trained, IICRC-certified restoration expert.
Water or Fire Damage in Clemmons? Why We Test for Asbestos Before Any Tear-Out, Even If the Adjuster Says You Don’t Need To
November 9, 2026
Material testing is an important step.
Your adjuster may look at the house, see that it was built in the 2000s, and say an asbestos test isn’t needed. We test anyway. On every job in our Triad service area, before we cut, scrape or pull up any building material after a water or fire loss, we sample what we’re about to disturb and send it to a lab. The age of the house doesn’t change that. What it doesn’t do is slow down your drying, because extraction, air movers and dehumidifiers go in on day one.
What do we actually test?
Only the materials we plan to disturb. If the wet area is a bathroom floor and the bottom foot of a hallway wall, we sample that flooring and that wall, not the whole house. These are the materials that come up most often on Clemmons water and fire jobs:
Clemmons has everything from older ranch homes to subdivisions that are still going up, and the newer ones aren’t automatically off the list. Builders and remodelers have used a lot of different products over the years, and a patch or repair can introduce a material nobody tracked. Remodeled homes are where surprises live. We regularly find an older vinyl floor under a newer one, or an old ceiling patched with new drywall. The paperwork for those layers is long gone.
How does the test work, step by step?
- We decide what will be disturbed. Our moisture map or the fire damage tells us which materials have to come out.
- A trained tech or our inspector collects small samples, usually about the size of a thumbnail, after misting the spot to keep dust down.
- Each sample goes into its own sealed, labeled bag, and the spot is patched or covered.
- Samples go to an accredited lab with a chain-of-custody form, so there’s a record of who handled them.
- The lab reads the samples under a microscope and reports whether asbestos is present and how much.
- We share the report with you and your adjuster before any tear-out.
Our team includes a certified asbestos inspector. Personally, I hold IICRC and lead certifications, and my own asbestos inspector certification is close to done.
How long do results take?
Usually the next business day. We have our own asbestos tester in-house, so we aren’t waiting in line behind everyone else’s samples. Weekends and holidays, like Thanksgiving week, can add a day.
While we wait, the drying doesn’t. That’s the part people miss.
Why doesn’t the adjuster’s opinion settle it?
Because the adjuster isn’t the one cutting the drywall. Your adjuster’s job is to decide what the policy pays for. Keeping our crew safe is our job, and federal law puts it on us.
OSHA’s asbestos rule for construction work (29 CFR 1926.1101) applies to repair, renovation and demolition work. It requires the employer to figure out whether asbestos is present before work starts and to keep workers’ exposure under set limits. OSHA has also said that buildings put up after 1980 can still contain asbestos, and that without reliable records, a suspect material must either be handled as if it contains asbestos or be sent to a lab.
The EPA’s asbestos NESHAP, a separate rule, covers renovation and demolition in commercial buildings and in apartment or condo buildings of five or more units. At the state level, the NC Health Hazards Control Unit expects an accredited asbestos inspector to check a building before it’s demolished or renovated, and Forsyth County runs its own local asbestos program on top of the state rules. Which rules apply depends on the building, but our crew’s safety obligation applies on every job.
What does this mean for your timeline?
Here’s how a typical water loss runs with testing built in:
- Day 1: Stop the water, extract it, map moisture, set air movers and dehumidifiers, and collect samples from anything we expect to remove. Belongings get moved out of the way.
- While results are pending: We keep drying and take daily readings. Often, drying in place means less has to come out at all.
- Results negative: We do controlled removal of the wet or damaged material and keep drying.
- Results positive: State rules say regulated asbestos material has to be taken out by an NC-accredited abatement contractor before anyone else disturbs it. We help line that up, then pick back up.
On a fire loss, the same logic applies. Soot cleanup and odor work can begin while the lab looks at the burned ceiling or flooring.
Will insurance pay for asbestos testing?
Policies vary; check with your agent. Some claims include testing, and some adjusters ask questions first. We give your adjuster the reason for each sample and the lab report, which usually answers most of those questions.
Clemmons asbestos testing questions
Does a newer home in Clemmons need an asbestos test? We test before tear-out on every home. Federal guidance says a post-1980 build date doesn’t rule asbestos out, and remodeled homes often hide older materials.
Which materials get sampled after water or fire damage? Only what we plan to disturb, most often joint compound, ceiling texture, vinyl flooring and mastic, and pipe insulation.
How long do asbestos test results take? Most of the time, by the next business day. Drying continues the whole time.
Will my insurance pay for asbestos testing? Coverage for testing comes down to your specific policy and claim. Policies vary; check with your agent.
Can drying start before results come back? Yes. Only removal waits on the lab.
Water, fire, or smoke damage in Winston-Salem, High Point, Kernersville, Clemmons or elsewhere in our Triad service area? Call Restoration 1 of the Triad 24/7 at 336-594-5424. Serving Clemmons, Winston-Salem, Kernersville and the rest of the Triad, we dry first and test before we tear out.
Ron Jones is a veteran, GM of Restoration 1 and a deWald-trained, IICRC-certified restoration expert.